KitchenAid KCIT736 Electric Cooking Specs
KitchenAid KCIT736 (Cooktop) places #75 of 234 certified U.S. electric cooking with 195 kWh/yr ($35.41/yr at 18.16c/kWh) and 5.0 zones. Sized for a 42-inch wide built-in opening, this chassis consolidates single SKU KCIT736S**** to prevent duplicate parts lookup. Projected electricity totals $460.33 over a 13-year NAHB lifespan at August 2026 EIA rates, keeping ENERGY STAR certified headroom under federal 10 CFR 430 rules.
- Rated Energy
- 195 kWh/yr
- EIA Annual Cost
- $35.41/yr
- Category Rank
- #75 of 234
- Capacity
- 5.0 zones
- NAHB Lifespan
- 13 years
How does KCIT736 compare across all 234 electric cooking?
KitchenAid KCIT736 (195 kWh/yr) sits against the electric cooking category median of 195.0 kWh/yr, Equal to median, and U.S. 10 CFR 430 baselines.
View quantile summary for Electric Cooking — KCIT736
| Quantile / Marker | Annual kWh/yr |
|---|---|
| Most efficient model | 175 kWh/yr kWh |
| 25th percentile | 190 kWh/yr kWh |
| Category median | 195 kWh/yr kWh |
| 75th percentile | 195 kWh/yr kWh |
| Highest rated draw | 195 kWh/yr kWh |
Where does KCIT736 rank in operating-cost percentile?
Ranked #75 of 234 rated electric cooking using EIA August 2026 national residential electricity rates (18.16 cents/kWh) over a 13-year NAHB median lifespan.
What are the official specs and computed benchmarks for KitchenAid KCIT736?
Complete EPA ENERGY STAR ratings, 10 CFR 430 federal compliance ceilings, NAHB median service expectancy (13 years), and estimated operating electricity costs at 18.16 cents/kWh.
| Specification / Metric | KCIT736 Value | Category / Federal Benchmark | Computed Insight & Formula |
|---|---|---|---|
| Rated Energy | 195 kWh/yr [U.S. Environmental Protection Agency (ENERGY STAR)] | Median 195 kWh/yr | Tied with 159 peers at 195 kWh/yr (matches median) |
| Capacity | 5.0 zones [U.S. Environmental Protection Agency (ENERGY STAR)] | Standard zones rating | 39.0 kWh/zones (-17.9% vs 47.5 median) |
| Cutout W × H × D | 36.3 × 3.68 × 21.3 in [U.S. Environmental Protection Agency (ENERGY STAR)] | Released 2025 | Single model listing (1 SKU) |
| Operating Cost (EIA) | $35.41/yr [U.S. Energy Information Administration (EIA)] | 18.16 c/kWh US avg | Formula: 195 kWh × $0.1816 = $35.41/yr ($460.33 over 13 yrs) |
| NAHB Service Life | 13 years [National Association of Home Builders (NAHB)] | 50% age gate: 6.5 yrs | Evaluate repair vs net replacement once age passes 8.5 yrs |
| Boil Test Time | 4.5 min | 240 V | Certified efficiency metric |
Which electric cooking match KCIT736 in cutout width and energy draw?
Five comparable U.S. ENERGY STAR base models matched closely on cabinet alcove width and annual energy draw so replacements clear existing cabinetry without electrical rework.
| Peer Model | Subtype | kWh/yr | Delta vs KCIT736 | Capacity | Cutout Dimensions | SKUs |
|---|---|---|---|---|---|---|
| JennAir JICT736 | Cooktop | 195 | Same kWh | 5.0 zones | 36.3 × 3.68 × 21.3 in | 1 |
| JennAir JICT736T | Cooktop | 195 | Same kWh | 5.0 zones | 36.3 × 3.68 × 21.3 in | 1 |
| Maytag MCIT8036 | Cooktop | 195 | Same kWh | 5.0 zones | 36.3 × 3.68 × 21.3 in | 1 |
| Whirlpool WCIT7536 | Cooktop | 195 | Same kWh | 5.0 zones | 36.3 × 3.68 × 21.3 in | 1 |
| Jenn-Air JEC3536 | Cooktop | 195 | Same kWh | 5.0 zones | 36.31 × 6.06 × 21.75 in | 1 |
Does KCIT736 carry R-600a, duct, or installation boundaries?
KCIT736 (Cooktop, 240 V, 36.3 in width) fits a standard countertop or slide-in cutout; confirm dedicated 40A-50A breaker ampacity before installation.
Induction glass-ceramic tops require ferromagnetic cookware and dedicated cooling fan clearance; high-voltage 240V IGBT/inverter board service requires a qualified technician.
- KCIT736S****
Should you repair KCIT736 or replace it under the 50% rule?
Enter your appliance age, out-of-warranty quote, and replacement price to test the 50% NAHB threshold plus DOE HEAR ($840 cap) and EPA RAD ($25-$100) net rebates.
FAQ
Clear answers to 8 common repair, safety, cost, and licensing questions backed by official government records and manufacturer manuals.
What does KitchenAid KCIT736 consume in kWh and dollars?
EPA data records 195 kWh/yr for KitchenAid KCIT736, costing $35.41/yr ($460 over 13 years) at 18.16 cents/kWh across 1 consolidated SKU finishes.
How far below the federal ceiling is KitchenAid KCIT736?
It posts 10 CFR 430 certified and places #75 of 234 electric cooking: Equal to median relative to the 195.0 kWh/yr median.
At what age does KitchenAid KCIT736 fail the 50% repair test?
Past 6.5 years of the 13-year NAHB benchmark, repair bids above half of net replacement minus $150 energy savings generally favor buying new.
Which buyers should skip KitchenAid KCIT736?
Skip KCIT736 if cabinet openings cannot clear 36.3 × 3.68 × 21.3 in, if 5.0 zones misses family sizing, or if commercial heavy-use durability is required.
Are KCIT736S**** mechanically the same model?
Yes; cosmetic finish trims (1 total SKUs) share identical 195 kWh/yr efficiency, 5.0 zones interior rating, and chassis assemblies.
Which safety boundaries restrict KitchenAid KCIT736 DIY work?
Always shut off the electrical breaker and water shutoff valve before opening KCIT736 service panels, probing solenoid coils, or inspecting drain pumps and sump float switches.
Which peer alternatives match KitchenAid KCIT736?
Review the 5 closest electric cooking listed above, sorted by 36.3 × 3.68 × 21.3 in cutout, 5.0 zones capacity, and annual kWh similarity.
What checks come before ordering KitchenAid KCIT736 replacement parts?
Decode the serial manufacture year, verify active KitchenAid CPSC recalls, and test the repair quote in the 50% estimator above.
Related guides
Sources
- ENERGY STAR Certified Residential Electric Cooking Products (m6gi-ng33) — U.S. Environmental Protection Agency (ENERGY STAR), Socrata Open Data API 2026 (retrieved 2026-11-25)
- Study of Life Expectancy of Home Components — National Association of Home Builders (NAHB), NAHB Component Lifespan Benchmarks (retrieved 2026-11-23)
- Electric Power Monthly Table 5.6.A: Average Price of Electricity to Residential Customers by State — U.S. Energy Information Administration (EIA), August 2026 & August 2025 (retrieved 2026-11-23)